Calcmeister

Stockpile volume and tonnage calculator

Enter the base width of the pile, the length of any straight section and the angle of repose. The calculator gives height, volume and tonnage.

m
m

0 for a round cone. For a long pile, the length of the straight part between the two rounded ends.

°
t/m³
Weight
– t
Volume
– m³
Height
– m
Footprint
– m²

    How the stockpile volume is calculated

    Loose material dropped from a conveyor or loader forms a cone. Its slope is the angle of repose, which depends on the material. From the base width and that angle the calculator finds the height and then the volume:

    h = r · tan α

    Cone: V = π ÷ 3 · r² · h

    Ridge pile: V = π ÷ 3 · r² · h + r · h · L

    A ridge pile is a long pile with a triangular cross-section and half cones at both ends. Its straight part adds a prism of r · h · L.

    Worked example

    A cone of dry sand has a base diameter of 20 m and an angle of repose of 35°. Its height is 10 × tan 35° = 7.0 m and its volume π/3 × 100 × 7.0 = 733 m³. At 1.6 t/m³ the pile weighs about 1,170 t. Stretched into a ridge with 30 m of straight length, the same base width holds 2,834 m³.

    Typical angles of repose

    MaterialAngle of repose
    Sand, dry30° – 35°
    Sand, moist35° – 40°
    Gravel, rounded30° – 35°
    Crushed stone38° – 45°
    Coal35° – 40°
    Road salt30° – 35°
    Grain23° – 28°
    Wood chips40° – 45°

    Values vary with moisture and particle shape. Measure your own pile for accurate inventory.

    Questions and answers

    How do I calculate the volume of a stockpile?

    For a cone: V = π/3 · r² · h, where r is half the base diameter and h the height. If you only know the base and the angle of repose, the height is r · tan(angle).

    How do I measure a stockpile on site?

    Measure the circumference at the base with a tape and divide by π to get the diameter. Measure the slope angle with an inclinometer app at several points and take the average.

    How accurate is this method?

    For a regular pile, within 5 to 10 %. Real piles are irregular and compacted at the bottom. For inventory accounting, drone or laser surveys are more accurate.

    Last reviewed: 2026-10-14. Results are estimates for planning. Check them before you rely on them for design, purchase or safety decisions.